Discover
Students will launch the Orlando theme park engineering challenge by defining the motion-safety problem, examining the needs of people affected by a loading system, and developing inquiry questions that guide later investigations of simple machines, direction, and speed.
Days 1 - 2
🎯 Challenge Definition
Deliverable 45m
πŸ‘₯ End User Overview + Inquiry Questions
Deliverable 45m

Edit Phase

Loading...
Examine
Students will investigate how pulleys, levers, and wheel-and-axle systems redirect force, measure and compare model-cart speeds, evaluate research sources, determine causes of unsafe or inconsistent motion, and propose an evidence-based loading-system solution for an Orlando theme park.
Days 3 - 11
🎒 Loading-System Motion Investigation
Launch 40m
βš™οΈ Simple-Machine Force Maps
Knowledge/Skill Building 45m
πŸ”Ž Theme Park Source Detectives
Research 40m
πŸ“š Source Evaluation Report
Deliverable 45m
⏱️ Pulley-Cart Speed Lab
Knowledge/Skill Building 45m
πŸ§ͺ Controlled Motion Test
Knowledge/Skill Building 45m
🌳 Root Cause Analysis
Deliverable 45m
πŸ“Š Loading Solutions Evidence Matrix
Research 45m
πŸ’‘ Solution Proposal
Deliverable 45m

Edit Phase

Loading...
Engineer
Students will work as Orlando theme park engineers to translate motion science into specifications, compare simple-machine concepts, plan a classroom-safe model, and document an evidence-based prototype revision before formal testing.
Days 12 - 17
➑️ Force-Path Design Specifications
Knowledge/Skill Building 40m
πŸ”Ž Exemplar Exploration
Deliverable 44m
⏱️ Cart Speed Test Lab
Knowledge/Skill Building 42m
πŸ§ͺ Hypothesis
Deliverable 36m
πŸ› οΈ Creation Plan
Deliverable 45m
πŸ”§ Solution Development Report
Deliverable 45m

Edit Phase

Loading...
Do
Students will finalize a controlled-test plan, safely operate their loading-system prototype, collect and analyze motion data, and revise the system using evidence prepared for a possible Disney Imagineering or school-community review.
Days 18 - 19
πŸ“‹ Implementation and Data Collection Plan
Deliverable 45m
πŸ“Š Implementation Results
Deliverable 45m

Edit Phase

Loading...
Share
Students will present and demonstrate their tested Orlando theme park loading-system prototypes to an authentic feedback panel, explain evidence-based improvements, and reflect on their growth as engineers.
Day 20
🌱 Growth Reflection
Assessment 45m

Edit Phase

Loading...